« Reply #17 on: April 13, 2014, 03:00:34 PM »
been a while since i have had an update. spent all day yesterday finishing the radiator,swapping the front subframe, and suspension, painting some things that you will not see anyway.

and today i put the the engine in for a mock up once everything is set to go i will pull it back out and paint the compartment. next on list install trans and smash floor to clear headers. then swap the rear subframe , diff and suspension.


Logged
90 rx7 gxl lq4, 59cc patriot stage 2 heads, arp head studs, comp trunnions, all arp bolts thru out, tsp 228r 114lsa, ls6 intake, bbk 80mm tb, cold air intake, ceramic coated long tube headers, dual 2.5 with x pipe magnaflows,00 mustang gt wheel w/ 275/40r17 nitto 555r, t2 rear swap delrin diff and subframe mounts welded front diff mount, custom diff brace, diamond stage 2 clutch w/ 15lb billet flywheel.